Location |
M.Sugurvillage, SiriguppaTaluk |
District / State |
Bellary, Karnataka |
Development type |
Run of the river plant utilizing head at the location. |
Installed capacity |
4.5 MW (3x1.5) |
River Stream / Canal |
River Tungabhadra |
Water conductor system |
Diversion structure , Forebay, Intake structure, Power house and tailrace channel |
Penstock |
Inlet pipe of 4mtr dia x 6mtr length |
Turbines |
Vertical full Kaplan |
Rated Discharge |
29 cumecs |
Rated Head |
6.2 mtr |
Generators |
Synchronous |
Power house |
31.5m (L) x 33m (W) x 30m (H) |
Date of Commissioning |
Nov 2006 |
Annual Generation Potential |
24.4 Mu |
Transmission line (already setup by BPCL) |
33KV Double circuit transmission line to Tekkalkota Substation about 25kms length |